Difference between revisions of "Cannon construction"
m |
m |
||
Line 4: | Line 4: | ||
* [[Solvent welding]] [http://www.burntlatke.com/weld.html correctly] | * [[Solvent welding]] [http://www.burntlatke.com/weld.html correctly] | ||
* Using pipe of the proper pressure rating, eg. sch 80 in a [[Hybrid Cannon]]. | * Using pipe of the proper pressure rating, eg. sch 80 in a [[Hybrid Cannon]]. | ||
− | * Only [[tap]] though a double layer of pipe where the pipe and a fitting is joined(for bolts, pressure gauges) . | + | * Only [[taping|tap]] though a double layer of pipe where the pipe and a fitting is joined(for bolts, pressure gauges) . |
Under no circumstances WHAT SO EVER should you use [[cell-core]] or unsleeved thinwall [[PVC]] pipe. | Under no circumstances WHAT SO EVER should you use [[cell-core]] or unsleeved thinwall [[PVC]] pipe. |
Revision as of 23:25, 24 October 2005
It is important to construct your launchers with care. This includes:
- Using pressure rated (NSF-PW or NSF-61) fittings and pipe, especialy in a pneumatic cannon.
- Solvent welding correctly
- Using pipe of the proper pressure rating, eg. sch 80 in a Hybrid Cannon.
- Only tap though a double layer of pipe where the pipe and a fitting is joined(for bolts, pressure gauges) .
Under no circumstances WHAT SO EVER should you use cell-core or unsleeved thinwall PVC pipe.